Namma Metro (Our metro) / The Bangalore Metro (Kannada: ಬೆಂಗಳೂರು ಮೆಟ್ರೊ) is completed. The agency responsible for its implementation is the Bangalore Metro Rail Corporation Ltd (BMRCL)


History of Namma Metro

Although mass transit for Bangalore had been in consideration for over two decades, the final approval on a scheme that incorporated the expertise of Delhi Metro Rail Corporation (DMRC) and the Indian Government-owned RITES infrastructure and transport consultancy did not come until April 2006. The rationale for the metro includes reduced journey times, cutting fuel use, accident reduction and lower pollution.

A detailed project report prepared by the Delhi Metro Rail Corporation (DMRC) and RITES envisaged a 33 km elevated and underground rail network with 32 stations for Phase I of the project. The proposed gauge was standard gauge unlike the broad gauge on the Delhi Metro network.

Construction work for Phase-1 of the project was scheduled to start in 2005 but was delayed by a February 2006 change of government in the state of Karnataka and continued debate over whether the project was financially feasible and appropriate for the city. Finally, on 25 April 2006 the Indian cabinet approved the project, which was then budgeted at more than Rs.5400 crore (about US$1.2 billion). In 2006, Navayuga Engineering was awarded the contract to construct Reach 1 on the East-West line.

The foundation stone for the Phase-1 construction was laid by Prime Minister Manmohan Singh on June 24, 2006.Construction on Reach-1 of the project between MG Road and Baiyyappanahalli commenced in 2007 and work on Phase-1 of the project is scheduled to be completed by 2012. The first line is scheduled to open in December 2011.

In 2007, BMRCL announced that it would incorporate a northern extension (from Yeshwantpur to Hessarghatta Cross) and part of the southern extension (from RV Road to Puttenahalli) in Phase I, thus extending the length of Phase I network to about 42 km, with 40 stations. The objective of this was to connect the Metro to the Outer Ring Road at both ends, as also cover the industrial areas of Peenya in the North-West, thereby providing better connectivity and increasing ridership. In October 2008, the Government of Karnataka approved this extension, which would cost an additional Rs.1592 crore.
The Route Map

The Bangalore Metro weaves through the bustling commercial and residential areas of the city. The first phase of Bangalore Metro, consisting of two corridors of double line electrified, will cover a total of 42.30 km.

The East-West corridor will be 18.10 km. long, starting from Byappanahalli and terminating at Mysore Road terminal, going via Old Madras Road, Indiranagar, C.M.H. Road, Ulsoor, Trinity Circle, M.G. Road, Cricket Stadium, Vidhana Soudha, Central College, Majestic, City Railway Station, Magadi Road, Hosahalli, Vijayanagar and Deepanjali Nagar.

The 24.20 km. North-South corridor will begin at Hessarghatta Road Terminal and terminate at Puttenahalli going via Mahalakshmi, Rajajinagar, Kuvempu Road, Malleswaram, Swastik, Majestic, Chikpet, City Market, K.R. Road, Lalbagh, South End Circle,Jayanagar and Puttenahalli.

Out of the 42.30 km., 8.822 km. will be underground near City Railway Station, Vidhana Soudha, Majestic and City Market and most of the rest will be elevated.
GAUGE : Standard Gauge

TRACTION : 750V dc Third Rail

SPEED Max : 80Kmph ; Sch. 32Kmph


TRAVEL TIME : 33/44 Mins. (end to end)

Fare Structure
Fares are likely to be pitched about 1.5 times that of equivalent bus routes, although there is an intention to amend bus services to a feeder role to the much higher capacity of the metro. The fare structure will vary between Rs. 7 and Rs. 15.
For More Information visit:

Post a Comment

  1. congratsssssss to alllllllll kannadigas n indians:):):) NAmma metro is inaguarated in BANGALORE!!! this ll show bangalore is developing very fast!!! not even mumbai can compete wit our bangalore:



Author Name

{picture#} Welcome to India's leading IRCTC Help blog. IRCTC Help, providing latest news of Indian Railways and IRCTC from the year 2009. Here IRCTC Help (IRCTC Online Passenger Reservation Information) provides information's like Special Trains, Cancelled Trains List, Traffic Block, IRCTC Website Guides, Metro & Mono Rail Info, Railway Mobile Applications Info, IRCTC Catering, Train Status, PNR Status details etc. You can read more details on our About page. {facebook#} {twitter#} {google#}

Contact Form


Email *

Message *

Powered by Blogger.